Marine · Cargo · Offshore & Energy · P&I
24/7  +55 21 98778 8964  |  +1 504 214 9113 Request a surveyor →
PICOLO & ASSOCIADOS, LTDA.
Marine and Cargo Surveyors
Practice Lines  /  Loss of Hire
04 Loss of Hire

Time isthe policy.

Loss of Hire turns on days, and days turn on evidence. We provide independent repair-period oversight and time-loss substantiation that holds up under scrutiny — slow steaming, deviation, and shipyard time, measured and recorded.

“Every day counts. We count them properly.”

Scope · A

Oversight
  • Repair-period attendance & oversight
  • Time-loss substantiation
  • Slow-steaming & deviation analysis
  • Shipyard-time verification

Scope · B

Coordination
  • Joint surveys with H&M
  • Critical-path review of repairs
  • Documentation for indemnity periods
  • Liaison with yard, owner, and underwriter

When to
instruct us

Bring us in when the clock starts, not when the claim is filed — contemporaneous records are what make a LOH claim stand.

Pick up. We answer.

Tell us the vessel, the port, and the problem. A surveyor will be on the way.

Request a surveyor   +55 21 98778 8964 (24/7)